How to Read Your PESCO Bill
Every field on a Peshawar Electric Supply Company bill, explained in the order it appears — plus the reading quirks specific to PESCO's network.
📄 Annotated PESCO bill image coming here — a real bill with every field labelled (personal details blurred).
Top of the bill: identity
- Reference number — 10–14 digits, the permanent ID of your connection. It never changes and is all you need to check or pay the bill.
- Name & address — as registered. A changed owner/tenant does not change the reference number; ownership transfer is a separate PESCO office process.
- Tariff code — A-1 residential, A-2 commercial, B industrial, D agricultural. Check this once: a wrong category means every bill is computed on the wrong rate card.
- Sub-division, feeder & batch — your local PESCOoffice and line. The batch explains why your due date differs from a relative's elsewhere in KP.
Middle: the meter's story
- Previous / present reading & dates — the billing window. Much over 30 days between dates inflates units into higher slabs; the printed dates are your evidence for a correction at the sub-division office.
- Units (kWh) — the difference between readings. On time-of-use meters the bill splits peak and off-peak lines with separate rates.
- Meter photo — where printed, compare its digits with the billed present reading; a mismatch is the cleanest billing complaint you can file.
- 12-month history — the table that shows whether this month is genuinely abnormal or just seasonal.
PESCO-specific reading notes
PESCO operates some of Pakistan's highest-loss feeders, so feeder-based load-shedding is more common than in Punjab DISCOs and varies street by street. Consumers formerly in Abbottabad, Mansehra and the rest of Hazara division are now billed by HAZECO, not PESCO.
Peshawar Electric Supply Company serves Peshawar, Mardan, Swat, Charsadda and surrounding districts — for coverage questions or a connection in a different region, start from the DISCO finder.
Bottom: money
- Energy charge — units through the slab ladder (current rates).
- FPA/FCA — the monthly fuel adjustment, explained here.
- GST, duty, PTV fee, surcharges — the tax stack.
- Arrears / instalments — carried-forward amounts.
- Payable within / after due date — pay the first figure by the due date; the second includes the late surcharge.
Something doesn't add up?
Call 118 (DISCO complaint line) or visit your PESCO sub-division office with the bill and your evidence (meter photo, payment receipt). Our PESCO complaints guide covers the escalation ladder including NEPRA, and the bill calculator gives you an independent estimate of what your units should cost.